UMES Plans to Install 2 Wind Turbines - WBOC-TV 16, Delmarvas News Leader, FOX 21 -

UMES Plans to Install 2 Wind Turbines

Posted:

PRINCESS ANNE, Md. (AP)- The University of Maryland Eastern Shore plans to install two wind turbines with enough power to fuel hundreds of homes to serve as instruments for student and faculty research.

The turbines should be operational by early next year.

UMES Vice President for research and economic development G. Dale Wesson says the university is negotiating the project through the Hawk Corp. research foundation with Eastern Shore Energy LLC, a subsidiary of Minneapolis-based National Renewable Solutions.

Wesson says plans call for two, 2-megawatt turbines capable of supplying direct electrical power to meet campus utility needs, but specific details such as the height and location of the turbines will be announced when a final agreement is reached.

 

  • Most Popular VideosMost Popular VideosMore>>

  • Hoopers Island Waterman Catches Large Bullshark in Chesapeake Bay

    Hoopers Island Waterman Catches Large Bullshark in Chesapeake Bay

    Larry "Boo" Powley says his Monday morning was a little bit more eventful than he had planned.  After a 300 lb. bull shark got caught in his fishing net, he says his phone has been ringing non-stop. 

    More

    Larry "Boo" Powley says his Monday morning was a little bit more eventful than he had planned.  After a 300 lb. bull shark got caught in his fishing net, he says his phone has been ringing non-stop. 

    More
  • Unexpected Discovery Made in Ocean City Median Project

    Unexpected Discovery Made in Ocean City Median Project

    Cones and construction are scattered along Coastal Highway in Ocean City. Initially postponed, the median project will put a divider up in the middle of the two lanes of traffic from 44th to 62nd St.

    State Highway Administration confirms the median project is on schedule and is expected to be completed by Memorial Day, but some folks in town have their doubts about that completion time.

    More

    Cones and construction are scattered along Coastal Highway in Ocean City. Initially postponed, the median project will put a divider up in the middle of the two lanes of traffic from 44th to 62nd St.

    State Highway Administration confirms the median project is on schedule and is expected to be completed by Memorial Day, but some folks in town have their doubts about that completion time.

    More
  • Suffers Healing Comes to Ocean City, Maryland

    Suffers Healing Comes to Ocean City, Maryland

    Surfers Healing is an organization who travels the world teaching Autistic kids how to surf. This is their ninth time visiting Ocean City, and are planning on coming back for many more years.  

    More

    Surfers Healing is an organization who travels the world teaching Autistic kids how to surf. This is their ninth time visiting Ocean City, and are planning on coming back for many more years.  

    More
Powered by Frankly

All content © Copyright 2000 - 2018 WBOC. All Rights Reserved. For more information on this site, please read our Privacy Policy, and Terms of Service, and Ad Choices